Domestic wastewater treatment tank of Power Plant No. 1


Power Plant No. 01 's domestic wastewater treatment system
CAPACITY 30M3/ DAY NIGHT
 
Address: Dong Nai.
Contract package: Design, fabrication and install.
Completion time: Oct, 2025
Output water quality: Class A, QCVN 14:2008/BTNMT.
Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
 











 
Completing On-Site Wastewater Treatment Tanks for Power Plants in the South: An Effective and Sustainable Solution
In the context of the energy industry increasingly focusing on environmental factors and sustainable development, investing in the construction and completion of on-site wastewater treatment tanks for power plants has become more urgent than ever. This is not only a mandatory requirement according to legal regulations, but also a part of the strategy to protect the environment and corporate image.
FDS is proud to contribute its small part to the national energy security project.
The Importance of Wastewater Treatment Systems at Power Plants
During operation, power plants generate many different types of wastewater such as:
- Wastewater from cooling systems,
- Water used to wash equipment and boilers,
- Domestic wastewater from workers and technicians
If not treated properly, these wastewaters can cause serious pollution to the soil, surface water, groundwater and affect public health.
Therefore, designing and completing an on-site wastewater treatment tank is an important step to:
Ensure the plant operates in accordance with environmental standards,
Minimize transportation or off-site treatment costs,
Improve the efficiency of water reuse within the plant.
Optimal Wastewater Treatment Tank Design and Construction Solutions
- An effective wastewater treatment system for a power plant needs to ensure:
- Capacity suitable for the plant's operational scale;
- Advanced treatment technology such as: physical chemistry, biology, MBR membrane filtration, multi-layer filtration, etc.;
- Sturdy treatment tank structure, easy to operate and maintain;
- Automation to save manpower and improve accuracy;
- Meet current QCVN on industrial waste discharge into the environment.
In addition, for power plants located in remote areas, on-site wastewater treatment solutions help reduce transportation costs and processing time significantly.
Benefits of Completing an On-Site Treatment Tank
- Comply with environmental laws;
- Proactively control the quality of discharged water;
- Optimize long-term operating costs;
- Contribute to building a green business image;
- Easy to integrate into the ISO 14001 environmental management system.
Reputable Wastewater Treatment System Construction Unit
We are proud to be a unit specializing in consulting - designing - constructing on-site wastewater treatment systems and large-scale industrial facilities. With a team of experienced engineers and a modern equipment system, we commit to:
- Construction on schedule - with the right quality,
- Consulting on solutions to save operating costs,
- Ensuring compliance with discharge standards according to QCVN.
See more: